login: Guelph's 100 steps to reopen in early 2018 after bridge replacement | Commentable

Guelph’s 100 steps to reopen in early 2018 after bridge replacement

Guelph 100 steps
The City of Guelph has closed off access to the 100 steps until the pedestrian bridge that goes over the railway tracks can be replaced. That’s expected to happen by the end of January.

Guelph’s 100 steps are set to reopen early in 2018 after the pedestrian bridge over the train tracks has been replaced, the city says.

OR


(adsbygoogle = window.adsbygoogle || []).push({});

Leave a Reply